BASIC INTERIORS - BACK TO BASICS
 


Design news

In this section we posting interior and furniture design news, to help you be in touch with latest trends on the market.
For your convenience our company's news are marked with bold font.


You can also subscribe to our news via RSS.What is RSS?

RSS-channel of our news



Windshield art in QuebecHammocks for the social

02.07.2013 — Narrow building in Shinagawa

The project Arrow is built on a long and narrow lot, adjacent to the owners' parents' house. Part of the first floor is used as a photo studio. The entrance is located on the second floor, where the living spaces are. The shallow sloped approach-stairs to the second floor entrance nicely match the sharp inclined wall. The second floor is an open space which includes a loft space that is accessible by a ladder.

Project Outline

Location : Shinagawa ward Tokyo
Date of Completion : March 2013
Principal Use : Private Housing
Structure : Steel Framing
Site Area : 118.36m2
Building Area: 46.43m2
Total Floor Area : 84.22m2 (42.11m2/1F, 42.11m2/2F)
Structural Engineer : Kenta Masaki
Mechanical Engineer : Zenei Shimada

www.kurosakisatoshi.com

Source: interiornews.com.








Find us on Facebook

Follow us on Twitter

Copyright © 2010-2025, Basic Interiors. Contact Us
Website programming and support - Mikhail Turenko. Website design by Peter Solodov.